C23-048 · Offshore Wind

Pipelinepost-trenching&rockbagrecovery

Client
Seagreen Project
Tooling
TRS1-LD & RSBG
Region
Carnoustie Bay, Scotland
Year
2023
Pipeline post-trenching & rock bag recovery

The challenge

Controlled flow excavation of three 300-metre pipeline sections to a depth of 2.7 m, plus remedial cable burial to 2 m top of cable, in three to six metres of water.

Our solution

The TRS1-LD jet trencher performed the excavation and cleared rock bag and debris sites, while the five-tonne RSBG recovered rock bags and anchors. Gemini NBI sonars provided real-time imaging throughout.

The result

All sections completed to specification in silty sand, with currents of one to two knots.

Next project

Cable burial with full project management

Read case study
Cable burial with full project management
Subsea cable resting in a freshly excavated trench on the seabed