C23-065 · Offshore Wind

Post-laytrenching&omegajointburial,USA

Client
Prysmian
Tooling
TRS1
Region
US East Coast
Year
2023
Post-lay trenching & omega joint burial, USA

The challenge

Trenching of two omega joints on the east and west HVAC cables, plus two 800 m sections from the offshore substation, in heavy sands with shell fragments.

Our solution

The TRS1 was deployed from a 15 Te A-frame and oriented perpendicular to focus CFE jets either side of the cable, at 2–3 m/min vessel speed.

The result

1.8 m depth of burial achieved as per contract, with no recorded delays or incidents.

Next project

Sandwave clearance, Belgian North Sea

Read case study
Sandwave clearance, Belgian North Sea
Subsea cable resting in a freshly excavated trench on the seabed

Start a conversation

Haveascopethatneedstogodeeper?

Tell us about your cable, pipeline or seabed challenge. Our engineers will recommend the right RS tooling and a delivery plan — typically within one working day.