Live 24" pipeline freespan rectification

The challenge

Precise intervention was required to address 17 freespan areas along a 24-inch domestic gas pipeline in soft clay seabed conditions.

Our solution

The TRS2 CFE tool was selected by the client for its superior controllability and productivity, operated by Rotech’s experienced CFE team.

The result

All identified freespans rectified, ensuring the pipeline was adequately supported along its full length.

Next project

Post-lay trenching & omega joint burial, USA

Read case study
Post-lay trenching & omega joint burial, USA
Subsea cable resting in a freshly excavated trench on the seabed

Start a conversation

Haveascopethatneedstogodeeper?

Tell us about your cable, pipeline or seabed challenge. Our engineers will recommend the right RS tooling and a delivery plan — typically within one working day.