C17-105 · Oil & Gas
Live24"pipelinefreespanrectification
- Client
- M.O.G.E
- Tooling
- TRS2
- Region
- Yadana Field, Myanmar
- Year
- 2017

The challenge
Precise intervention was required to address 17 freespan areas along a 24-inch domestic gas pipeline in soft clay seabed conditions.
Our solution
The TRS2 CFE tool was selected by the client for its superior controllability and productivity, operated by Rotech’s experienced CFE team.
The result
All identified freespans rectified, ensuring the pipeline was adequately supported along its full length.