C22-193 · Offshore Wind
Deburial,cut&recoveryoffshoreGermany
- Client
- Offshore contractor
- Tooling
- TRS2 & RSG-C
- Region
- North Sea, Germany
- Year
- 2023

The challenge
Four damaged array cable sections needed to be deburied, cut and recovered to deck from a 99-metre DP-2 construction vessel in 22–26 m of water, with currents up to 1.2 knots.
Our solution
The TRS2 exposed each section in 30 minutes or less. The RSG-C then located, gripped, cut and recovered the cable in a single operation — under one hour per section from identification to cut ends on deck.
The result
After repair, the TRS2 reburied the new sections to 2 m top of cable in 30 minutes or less per section.
Next project
Pipeline post-trenching & rock bag recovery
Read case study

Start a conversation
Haveascopethatneedstogodeeper?
Tell us about your cable, pipeline or seabed challenge. Our engineers will recommend the right RS tooling and a delivery plan — typically within one working day.